Kimlun Corporation Berhad Annual Report 2023

large commercial-grade waste bins to collect construction waste and non-construction wastes silt traps to collect and store sediment from sites cleared during construction wash trough for vehicles to wash their muddy tyres before exiting project sites cleaning the public roads leading to our construction sites with high-power water jets to maintain road cleanliness constructing temporary earth drains (where necessary) to prevent water ponding and flooding where relevant, adopting sustainable Urban Drainage System to drain off stormwater to control flash floods and control water runoff quality For projects where we engage the services of contractors or subcontractors, we maintain close collaboration with contractors and subcontractors to ensure processes and activities at the sites are compliant and in accordance with our internally set standards, including in the areas of waste management. We are currently developing procedures to collect data relating to our waste management. Key waste management measures at our construction sites: SUSTAINABILITY STATEMENT 037 Annual Report 2023

RkJQdWJsaXNoZXIy NDgzMzc=