ENERGY MANAGEMENT (CONT'D) The increase in diesel usage by the mill in FY2025 was primarily attributed to the ongoing repairs of the existing 3 megawatt (MW) turbine. The backup turbine, with a capacity of 2 MW and 2.5 MW, is only capable of generating enough electricity to operate the 90 MT per hour CPO mill. Consequently, this limitation has resulted in the kernel crushing plant, which has a processing capacity of 90 MT per day, relying on electricity produced by the genset for its operations. This reliance has resulted in an increase in diesel usage during FY2025. In FY2025, the estates used a total of 194,597 litres of petrol, for transportation purposes; Estates MKHOP head quarter Petrol Usage For (Transport) (Litre) Petrol Usage For Used By Volume (Litre) FY2025 FY2024 FY2023 Transport Estates 185,391 187,414 156,057 MKHOP head quarter 9,206 No Data No Data Total 194,597 187,414 156,057 The total electricity consumption purchased by MKHOP for FY2025 was approximately 59,791 kilowatthours (kWh) in the operations in Malaysia and Indonesia. This electricity was acquired through standard grid-mix contracts with Tenaga Nasional Berhad and PT Perusahaan Listrik Negara (PLN), respectively. FY2025 185,391 187,414 156,057 9,206 FY2024 FY2023 The total electricity consumption purchased by MKHOP for FY2025 was approximately 59,791 kilowatt-hours (kWh) in the operations in Malaysia and Indonesia. 59,791 KILOWATT-HOURS (kWh) 4 Sustaining Lives, Empowering Communities 1 3 6 2 5 7 PG | 79 ANNUAL REPORT 2025 MKH BERHAD
RkJQdWJsaXNoZXIy NDgzMzc=