Kimlun Corporation Berhad Annual Report 2025

PRODUCTION PLANT AND PRODUCTS SARAWAK • Aggregates • Premix • Concrete drains JOHOR • Tunnel lining segment • Rail sleeper • Jacking pipe • Vertical cast pipe • Box culverts • Prefabricated prefinished volumetric module • Hollow core slab • Column and beam • Aggregates • Premix NEGERI SEMBILAN • Tunnel lining segment • Segmental box girder • Parapet walls • Column and beam Constrution Projects Balance order book as at 31 Dec 2025: RM4.47 billion Notable completed projects include: • Main building works for Marlborough College East, Johor • Mall of Medini, Johor • Granada Hotel, Johor • Gleneagle Medini Hospital, Johor • Pan Borneo Highway Sarawak On-going projects include: • Sarawak-Sabah Link Road • Various apartment and landed properties projects in Selangor and Johor Completed sales orders include: • Segmental box girder (“SBG”) and tunnel lining segment (“TLS”) to Klang Valley MRT (“KVMRT”) Line 1 and Line 2 • TLS to Singapore MRT Circle Line, Downtown Line and Thomson Line • Precast Bathroom to Michael and Festival Hotel, Singapore On-going sales orders include: • TLS, rail sleepers and IBS for Singapore MRT projects • Jacking pipes for Singapore Deep Tunnel Sewerage project • IBS for Singapore Integrated Waste Management Facility Manufacturing Order Balance order book as at 31 Dec 2025: RM0.26 billion Public sectorPrivate sector Building projects Infrastructure projects All projects in Malaysia 32% 66% 68% 34% Malaysia orders Singapore orders 1% 99% 018 KIMLUN CORPORATION BERHAD • MANAGEMENT DISCUSSION AND ANALYSIS

RkJQdWJsaXNoZXIy NDgzMzc=