PRODUCTION PLANT AND PRODUCTS Constrution Projects Manufacturing Order Negeri Sembilan • Tunnel lining segment • Segmental box girder • Parapet walls • Column and beam Sarawak • Aggregates • Premix • Concrete drains Notable completed projects include: • Main building works for Marlborough College East, Johor • Mall of Medini, Johor • Granada Hotel, Johor • Gleneagle Medini Hospital, Johor • Pan Borneo Highway Sarawak On-going projects include: • Sarawak-Sabah Link Road • Various apartment and landed properties projects in Selangor and Johor Complete sales orders include: • Segmental box girder (“SBG”) and tunnel lining segment (“TLS”) to Klang Valley MRT (“KVMRT”) Line 1 and Line 2 • TLS to Singapore MRT Circle Line, Downtown Line and Thomson Line • Precast Bathroom to Michael and Festival Hotel, Singapore On-going sales orders include: • TLS, rail sleepers and IBS for Singapore MRT projects • Jacking pipes for Singapore Deep Tunnel Sewerage project • IBS for Singapore Integrated Waste Management Facility All projects in Malaysia Balance order book as at 31 Dec 2024: RM3.1 billion Balance order book as at 31 Dec 2024: RM0.3 billion Johor • Tunnel lining segment • Rail sleeper • Jacking pipe • Vertical cast pipe • Box culverts • Prefabricated prefinised volumetric module • Hollow core slab • Column and beam • Aggregates • Premix Public sector 81% Private sector 19% Building projects 76% Infrastructure projects 24% Malaysia orders 99% Singapore orders 1% MANAGEMENT DISCUSSION AND ANALYSIS 018
RkJQdWJsaXNoZXIy NDgzMzc=