Constructions of 115 bridges and 56 pedestrian bridges to ensure accessibility and safety 2,080 drainage culverts to manage water flow effectively. 3,700 junctions and 202 P-turns, creating a more connected network within Sarawak. UEM Edgenta through OPUS Consultants, were involved with Pan Borneo Highway Sarawak Phase 1 involving 786km OPUS Consultants was appointed as the Independent Consulting Engineer (ICE) to provide professional technical consultancy and advisory services involving: Asset Consultancy BUSINESS REVIEW UEM EDGENTA BERHAD 100 Integrated Annual Report 2024
RkJQdWJsaXNoZXIy NDgzMzc=