Kimlun Corporation Berhad Annual Report 2023

NEGERI SEMBILAN • Tunnel lining segment • Segmental box girder • Parapet walls • Column and beam JOHOR • Tunnel lining segment • Rail sleeper • Jacking pipe • Vertical cast pipe • Box culverts • Prefabricated pre nished volumetric module • Hollow core slab • Column and beam • Aggregates • Premix SARAWAK • Aggregates • Premix • Concrete drains PRODUCTION PLANT AND PRODUCTS CONSTRUCTION PROJECTS MANUFACTURING ORDERS Notable completed projects include: • Main building works for Marlborough College East, Johor • Mall of Medini, Johor • Granada Hotel, Johor • Gleneagle Medini Hospital, Johor • Pan Borneo Highway Sarawak On-going projects include: • Sarawak-Sabah Link Road • Various apartment and landed properties projects in Selangor and Johor Completed sales orders include: • Segmental box girders (“SBG”) and tunnel lining segment (“TLS”) to Klang Valley MRT (“KVMRT”) Line 1 and Line 2 • TLS to Singapore MRT Circle Line, Downtown Line and Thomson Line • Precast Bathroom to Michael and Festive Hotel, Singapore On-going sales orders include: • TLS, rail sleepers and IBS for Singapore MRT projects • Jacking pipes for Singapore Deep Tunnel Sewerage project • IBS for Singapore Integrated Waste Management Facility and a resort development Sector Type Private sector (67%) Project Type Infrastructure projects (39%) Public sector (33%) Building projects (61%) Orders by Country Singapore orders: (97%) Malaysia orders: (3%) RM2.0 billion Balance order book as at 31 December 2023 RM0.3 billion Balance order book as at 31 December 2023 All projects in Malaysia MANAGEMENT DISCUSSION AND ANALYSIS Kimlun Corporation Berhad 018

RkJQdWJsaXNoZXIy NDgzMzc=