Kimlun Corporation Berhad Annual Report 2022

Public sector 51% Private sector 49% Building projects 44% Infrastructure projects 56% 1% 99% PRODUCTION PLANT AND PRODUCTS MANAGEMENT DISCUSSION AND ANALYSIS CONSTRUCTION PROJECTS Balance order book as at 31 Dec 2022 RM1.38 billion Notable completed projects include: • Main building works for Marlborough College East, Johor • Mall of Medini, Johor • Granada Hotel, Johor • The Sky Loft Suites, Johor • Gleneagle Medini Hospital, Johor Ongoing projects include: • Pan Borneo Highway Sarawak • Sarawak-Sabah Link Road • Various apartment and landed properties projects in Selangor and Johor MANUFACTURING ORDERS Balance order book as at 31 Dec 2022 RM0.35 billion Completed sales orders include: • Segmental box girders (“SBG”) and tunnel lining segment (“TLS”) to Klang Valley MRT (“KVMRT”) Line 1 and Line 2 • TLS to Singapore MRT Circle Line, Downtown Line and Thomson Line • Precast Bathroom to Michael and Festive Hotel, Singapore Ongoing sales orders include: • SBG for train testing center • TLS, rail sleepers and IBS for Singapore MRT projects • Jacking pipes for Singapore Deep Tunnel Sewerage project • IBS for a resort development JOHOR • Tunnel lining segment • Rail sleeper • Jacking pipe • Vertical cast pipe • Box culverts • Prefabricated prefinished volumetric module • Hollow core slab • Column and beam • Aggregates • Premix NEGERI SEMBILAN • Tunnel lining segment • Segmental box girder • Parapet walls • Column and beam SARAWAK • Aggregates • Premix • Concrete drains All projects in Malaysia Malaysia orders Singapore orders Annual Report 2022 18

RkJQdWJsaXNoZXIy NDgzMzc=