10 October 2014 AET took delivery of industry’s most advanced DP shuttle tanker At a ceremony held at Samsung Heavy Industries (SHI) shipyard in Busan, South Korea on 10 October 2014, AET took delivery of Eagle Barents, a 120,000 dwt DPII shuttle tanker built to the industry’s most demanding “Goliat” standard. It is twin skeg, twin engine, fitted with a new generation bow loading system for cold climate operations and fully winterised in accordance with DNV’s cold notation. In addition, the vessel is fitted with a range of eco-innovations to reduce its impact on the natural environment. 3 November 2014 MHB secured contracts worth RM350 million MHB secured contracts close to RM350 million involving fabrication and other related works for offshore Peninsular Malaysia exploration and production projects. The fabrication and related works will be for the North Malay Basin (NMB) Bergading Complex. The project is scheduled to be delivered by 2016. The second contract is for the procurement, construction, hook up and commissioning contract for the Besar-A wellhead platform and its jacket as well as associated host tie-in work for PETRONAS Carigali Sdn. Bhd. scheduled to be completed by the end of 2015. OCT 2014 NOV 2014 5 November 2014 MHB bagged turret contract MHB was awarded a fabrication contract for an external turret mooring system from Specialized Offshore Facilities and Engineered Components (SOFEC) Incorporated. The turret is scheduled for delivery and sail away in 2016 to its facility in Rotan Field, Sarawak, East Malaysia. The turret is for the PETRONAS FLNG2 Facility and it will be MHB’s 20th turret constructed. p 85 MISC BERHAD - Annual Report 2014
RkJQdWJsaXNoZXIy NDgzMzc=