29 March 2014 Sail away of FPSO Cendor Project MHB completed the conversion of FPSO Cendor for MISC Berhad which is now deployed at Cendor field, offshore Terengganu, Malaysia. The scope of work covered engineering, procurement, construction and commissioning work for the 12,032 MT facility. 17 April 2014 MHB delivered Tapis-R topsides MHB marked another milestone with the delivery of the Tapis-R topsides for ExxonMobil Exp l o r a t i on and Pr oduc t i on Ma l ay s i a Incorporated (EMEPMI). The project is one of the largest Enhanced Oil Recovery (EOR) projects in Southeast Asia and was highlighted by the Prime Minister Dato’ Sri Najib Tun Razak under Malaysia’s Economic Transformation Programme in 2011. 17 April 2014 MISC deployed Bunga Mas Enam (BM6) to assist in MH370 search operations At the request of Majlis Keselamatan Negara (MKN) to provide logistical support in search of MH370 in Southern Indian Ocean, MISC’s Naval Auxiliary vessel Bunga Mas Enam (BM6) joined TLDM’s KD Lekiu and 17 other vessels. The ship carried a crew of 25 MISC sea staff who are also reservists from the Royal Malaysian Navy (RMN) Volunteer Reserve Unit (PSSTLDM) as well as two (2) members from the Medical Team of the Malaysian Army. MAR 2014 APR 2014 p 81 MISC BERHAD - Annual Report 2014
RkJQdWJsaXNoZXIy NDgzMzc=